BRUZ (35) - DGA MI - Création d'un bâtiment et de VRD dans le cadre de la refonte de l'entrée sud - 460478
SID Nord-Ouest
Ille-et-Vilaine
05 oct. 2026
12 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 5 octobre 2026, in 10 days.
- The contract is split into 2 lots. You may bid on the one that fits you only.
- Duration: 6 months.
- social criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 1er juin 2027.
The notice does not state : the question deadline, the score breakdown (aucune pondération chiffrée dans l'avis), the estimated value. These are in the consultation rules inside the tender file.
isabelle.teriierooiterai@intradef.gouv.fr 0223352202
How many rivals you actually face
sur les marchés « Gros oeuvre », la médiane est de 4 offres par lot. 38 % des lots en reçoivent trois ou moins, et seulement 4 % dépassent dix candidats.
Measured on 116 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87908.