Démolition et génie-civil du parking souterrain Carpeaux et de la rue des Carrières - Relance suite à la déclarations sans suite du lot n°8 de la précédente procédure
Ville de Creil
Oise
17 nov. 2026
12 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The buyer is relaunching a consultation that failed: the previous round produced no acceptable bid. This is the kind of contract where the field is empty, and they are rare.
- Bids due on 17 novembre 2026, in 53 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 6 months, renewable.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (aucune pondération chiffrée dans l'avis), the estimated value. These are in the consultation rules inside the tender file.
service.marchespublics@mairie-creil.fr +33 344295094
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
66 % des offres viennent de PME.
Measured on 4666 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87966.