Vérifications périodiques règlementaires, contrôles, diagnostics des équipements, installations et bâtiments de PMMCU
Perpignan Méditerranée Métropole Communauté Urbaine
Pyrénées-Orientales
13 oct. 2026
13 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 13 octobre 2026, in 17 days.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- La technique pèse 60 % contre 40 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- Duration: 4 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 1er février 2027.
The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.
accueil.pmca@perpignan-mediterranee.org 0468086000
How this buyer will score
La technique pèse 60 % contre 40 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- 55% Valeur technique
- 5% Développement durable
- 40% Prix des prestations
How many rivals you actually face
sur les marchés « Prestations de services », la médiane est de 3 offres par lot. 58 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
74 % des offres viennent de PME.
Measured on 332 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88171.