N)2026-09-08 Traitement des déchets issus du balayage urbain
Communauté de Communes de Beaucaire (30)
Gard
29 oct. 2026
16 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 29 octobre 2026, in 34 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 4 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 1er janvier 2027.
The notice does not state : the question deadline, the score breakdown (aucune pondération chiffrée dans l'avis), the estimated value. These are in the consultation rules inside the tender file.
juridique@laterredargence.fr +33 466595454
How many rivals you actually face
sur les marchés « Prestations de services », la médiane est de 3 offres par lot. 58 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
74 % des offres viennent de PME.
Measured on 332 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-89152.