N)2026-09-08 Traitement des déchets issus du balayage urbain
Communauté de Communes de Beaucaire (30)
Gard
29 Oct 2026
16 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 29 October 2026, in 34 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 4 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 1 January 2027.
The notice does not state : the question deadline, the score breakdown (aucune pondération chiffrée dans l'avis), the estimated value. These are in the consultation rules inside the tender file.
juridique@laterredargence.fr +33 466595454
How many rivals you actually face
on "Prestations de services" contracts, the median is 3 bids per lot; 58% of lots get three or fewer, and only 8% get more than ten.
74% of the bids come from SMEs.
Measured on 332 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-89152.