ACCORD-CADRE DE MAÎTRISE D'OEUVRE
SICTOM PEZENAS-AGDE
Hérault
19 oct. 2026
20 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 19 octobre 2026, in 24 days.
- 4 suppliers will be selected: you do not need to be the best, only to be in the top 4.
- The contract is split into 2 lots. You may bid on the one that fits you only.
- Duration: 4 months.
- Estimated value: 2 700 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 1er mars 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
correspondre@aws-france.com 0467985805
This address is a platform relay: without a consultation reference your message may go nowhere. The phone is safer.
How many rivals you actually face
sur les marchés « Maîtrise d'oeuvre », la médiane est de 6 offres par lot. 32 % des lots en reçoivent trois ou moins, et seulement 34 % dépassent dix candidats.
92 % des offres viennent de PME.
Measured on 88 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-90631.