Alguns conteúdos estão disponíveis em inglês. O texto original do anúncio é a referência.
Maîtrise d'oeuvre conception-exécution réalisation 2 constructions sur le même terrain : bâtiment socio-culturel d'une surface d'environ 600 m², immeuble d'habitation collective de 6 logements
Commune de LURI
Haute-Corse
30/10/2026
02/10/2026
To win this one
- The price: Ordre de grandeur du métier en France (359 marchés attribués de ce métier) : un quart sous 154 901 €, médiane 340 134 €, trois quarts sous 743 769 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 340 134 € (médiane du métier, 359 marchés), 5 offres attendues (médiane du métier, 247 marchés) ; environ 68 027 € espérés, ordre de grandeur, pas un devis.
- The clock: 4 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- PERCY INGENIERIE won « Réalisation d'une mission de maîtrise d'œuvre pour l'immeuble Le Spallis à Saint-Denis » with AGENCE DE GESTION DE L'IMMOBILIER DE L'ETAT (Seine-Saint-Denis) : 118 225 €, 16/10/2026
- SMTPC won « Conception et réalisation des travaux de construction d'un nouveau Centre d'Incendie et de Secours à Chirongui » with SDIS (976) (Mayotte) : 8 953 476 €, sole bidder, 22/10/2026
- AGA ARCHITECTES ASSOCIES won « Maitrise d'oeuvre pour la construction du pôle culturel et social à la Haye Pesnel » with Communauté de Communes Granville Terre et Mer (Manche) : 4 bids, 10/10/2026
- DOSSE ARCHITECTE ASSOCIES, JACQUES GERBES & ASSOCIES won « Marché de maitrise d'oeuvre pour la construction de gendarmeries, composées de locaux de services et logements » with SPL71, agissant au nom et pour le compte du Conseil Départemental de Saône et Loire (Saône-et-Loire) : 3 bids, 09/10/2026
- Archivolto won « Loudéac - Les Noëlles - Réhabilitation de 50 logements - Maîtrise d'œuvre » with TERRES D'ARMOR HABITAT (Côtes-d'Armor) : 227 500 €, 02/09/2026
Across these 5 contracts: median amount €227,500 (3 published) ; median of 3 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 octobre 2026, in 4 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
caroline.monti@luri.fr +33 495350015
How many rivals you actually face
sur les marchés « Maîtrise d'oeuvre », la médiane est de 5 offres par lot. 36 % des lots en reçoivent trois ou moins, et seulement 30 % dépassent dix candidats.
93 % des offres viennent de PME.
Stakes: Enjeu observé : 340 134 € (médiane du métier, 359 marchés), 5 offres attendues (médiane du métier, 247 marchés) ; environ 68 027 € espérés, ordre de grandeur, pas un devis.
Measured on 100 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-94482.