Alguns conteúdos estão disponíveis em inglês. O texto original do anúncio é a referência.
Erection and related works of roof frames and coverings, Los 1-003 B Dach- und Zimmerarbeiten Altbau und Verbinder - GNUE Amtsgericht Bitterfeld-Wolfen, Sanierung und Erweiterungsbau
Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe
Alemanha
25/11/2026
23/10/2026
To win this one
- The clock: Due today: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 56 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
63 % des offres viennent de PME, et dans 25 % des lots aucune PME n'a candidaté.
Measured on 4466 awarded lots that publish their statistics. 55% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference ted-734911-2026.