En del innehåll finns på engelska. Den ursprungliga annonsen är den gällande texten.
Enlèvement et mise en fourrière des véhicules en infraction au code de la route
Ville d'Albertville
Savoie
02 dec. 2026
20 okt. 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Prix observés dans ce département (8 marchés attribués de ce métier) : un quart sous 73 758 €, médiane 117 429 €, trois quarts sous 318 000 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 280 000 € (médiane du métier, 177 marchés), 2 offres attendues (médiane du métier, 118 marchés) ; environ 140 000 € espérés, ordre de grandeur, pas un devis.
- The clock: 11 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- CARROSSERIE MPR won « PRESTATIONS DE MISE EN FOURRIÈRE DE VÉHICULES POUR LES BESOINS DE LA VILLE D'ISTRES » with COMMUNE D'ISTRES (Bouches-du-Rhône) : 370 €, sole bidder, 20/10/2026
- SERVICE 24 won « Enlèvement de véhicules en infraction sur le territoire de la ville de Grenoble ou les terrains lui appartenan » with VILLE DE GRENOBLE (Isère) : 280 000 €, 3 bids, 15/10/2026
- TOTALENERGIES MARKETING FRANCE won « Enlèvement de carburant à la pompe pour les véhicules » with Commune de Pontault-Combault (Seine-et-Marne) : 740 000 €, 25/10/2026
Across these 3 contracts: median amount €280,000 (3 published) ; median of 2 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 2 décembre 2026, in 11 days.
- Duration: 12 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 56 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
64 % des offres viennent de PME, et dans 21 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 280 000 € (médiane du métier, 177 marchés), 2 offres attendues (médiane du métier, 118 marchés) ; environ 140 000 € espérés, ordre de grandeur, pas un devis.
Measured on 4519 awarded lots that publish their statistics. 55% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-101873.