En del innehåll finns på engelska. Den ursprungliga annonsen är den gällande texten.
Travaux de rénovation et d’extension du centre socio-culturel du Marais à Schiltigheim
Ville de Schiltigheim
Bas-Rhin
25 nov. 2026
23 okt. 2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8 lot 9 lot 10 lot 11 lot 12 lot 13 lot 14 lot 15 lot 16 lot 17 lot 18
Technical proposal per lot (one draft per lot): Proposal for lot 1 Proposal for lot 2 Proposal for lot 3 Proposal for lot 4 Proposal for lot 5 Proposal for lot 6 Proposal for lot 7 Proposal for lot 8 Proposal for lot 9 Proposal for lot 10 Proposal for lot 11 Proposal for lot 12 Proposal for lot 13 Proposal for lot 14 Proposal for lot 15 Proposal for lot 16 Proposal for lot 17 Proposal for lot 18
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Enjeu observé : 582 775 € (médiane du métier, 283 marchés), 3 offres attendues (médiane du métier, 184 marchés) ; environ 194 258 € espérés, ordre de grandeur, pas un devis.
- The clock: 7 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- ETS MANENT ET FILS, QUALIT'R won « Travaux de Rénovation et d’extension du centre de réhabilitation respiratoire Filieris de Folcheran » with CANSSM (Ardèche) : 214 645 €, 24/09/2026
- DEMOLITION BRETAGNE SERVICE, LEGENDRE OUEST won « Travaux pour la rénovation et l'extension de la Criée municipale à Quiberon » with COMMUNE DE QUIBERON (Côtes-d'Armor) : 110 330 €, 31/10/2026
- ERTCM INDUSTRIES, DUFRAIGNE COUVERTURE won « PANOPTIQUE D’AUTUN, RENOVATION ET EXTENSION DU MUSEE ROLIN TRANCHE OPERATIONNELLE 1 (TO1) - (relance des lots » with Ville d'Autun (Saône-et-Loire) : 932 253 €, 08/11/2026
- Verspieren, MUTUELLE ARCHITECTES FRANCAIS won « Assurance Construction pour les opérations : 1 - Construction d'un Centre Aquatique 2 - Extension, restructura » with Ville de Carquefou (Loire-Atlantique) : 475 024 €, 13/11/2026
- SELTZ CONSTRUCTIONS, ISOLATIONS RAUSCHMAIER SAS won « Extension du centre lourd d'hémodialyse » with Hôpitaux Civils de Colmar (68) (Haut-Rhin) : 845 121 €, 19/09/2026
Across these 5 contracts: median amount €475,024 (5 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 25 novembre 2026, in 7 days.
- The contract is split into 18 lots. You may bid on the one that fits you only.
- Duration: 21 months.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
commande.publique@ville-schiltigheim.fr +33 388838405
How many rivals you actually face
sur les marchés « Bâtiment », la médiane est de 4 offres par lot. 34 % des lots en reçoivent trois ou moins, et seulement 6 % dépassent dix candidats.
87 % des offres viennent de PME.
Stakes: Enjeu observé : 582 775 € (médiane du métier, 283 marchés), 3 offres attendues (médiane du métier, 184 marchés) ; environ 194 258 € espérés, ordre de grandeur, pas un devis.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-103070.