Travaux pour une centrale photovoltaïque au sol avec stockage batterie en autoconsommation collective sur la commune de Bréhand.
Sem Energies 22
Côtes-d'Armor
25 Sept 2026
03 Aug 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The notice was amended on 2026-08-10. The deadline did not move, so the file itself changed: reread it before submitting, a bid answering the previous version gets rejected.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 61% of lots get three or fewer, and only 4% get more than ten.
66% of bids come from SMEs, and in 18% of lots no SME bid at all.
Measured on 4835 awarded lots that publish their statistics. 54% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-77510.