Prestation de restauration
Centre GRAND EST NANCY
Meurthe-et-Moselle
02 Oct 2026
26 Aug 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Questions to the buyer until 27 September 2026, i.e. 32 days.
- Bids due on 2 October 2026, in 38 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 4 months, renewable.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 4 January 2027.
The notice does not state : the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
achats-grand-est@inrae.fr 0383394014
How many rivals you actually face
on "Restauration collective" contracts, the median is 3 bids per lot; 64% of lots get three or fewer, and only 0% get more than ten.
0% of bids come from SMEs, and in 100% of lots no SME bid at all.
Measured on 36 awarded lots that publish their statistics. 54% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-82744.