Impression De Supports De Communication Institutionnelle
Commune de La Hague
Manche
28 Sept 2026
26 Aug 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Impression" contracts, the median is 4 bids per lot; 47% of lots get three or fewer, and only 0% get more than ten.
83% of the bids come from SMEs.
Measured on 30 awarded lots that publish their statistics. 54% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-83336.