Marché de maitrise d'oeuvre pour la réalisation d'une opération de restructuration et surélévation de la résidence Lalande - Lyon 6e
Adoma Siège
Rhône
19 Nov 2026
18 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Observed prices in this département (12 awarded contracts in this trade): a quarter under €197,998, median €464,338, three quarters under €1,292,950; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- Units Architecture, BENJAMIN FLEURY Architecte-Urbaniste won « PRESTATIONS DE MAITRISE D'OEUVRE POUR LA REALISATION D'OPERATIONS D'ACCESSION A LA PROPRIETE ET MIXTES EN VEFA » with Expansiel Promotion (Val-de-Marne) : 18/10/2026
- SPA won « Mission de maitrise d'oeuvre pour l'installation d'une maison de la Métropole de Lyon (MDML) au 5, cours Suche » with Métropole de Lyon (Rhône) : €189,600, 19 bids, 10/11/2026
- GROUPEMENT DEMAIN ARCHITECTURE PAYSAGE won « MOE PROJET EXTENSION DES LOCAUX DE SCIENCE PO LYON » with COMUE LYON SAINT-ETIENNE (Rhône) : €191,990, 07/10/2026
- NIETO SOBEJANO ARQUITECTOS won « Maîtrise d'oeuvre dans le cadre de l'opération de transformation et d'ouverture des espaces d'accueil du publi » with Opéra national de Paris (Paris) : 5 bids, 29/09/2026
- NALDEO, SCE won « MISSIONS DE MAITRISE D'OEUVRE ELARGIES POUR LA REALISATION D'OPERATIONS EN EAU, ASSAINISSEMENT ET HYROELECTRIC » with RESEAU 31 (Haute-Garonne) : €2,200,000, 3 bids, 06/11/2026
Across these 5 contracts: median amount €191,990 (3 published) ; median of 5 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The question deadline has passed (10 November 2026). Nobody can clarify the specifications any more: you will bid with whatever is unclear.
- Bids due on 19 November 2026.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- Duration: 46 months.
- Estimated value: 0 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
jean-marie.debray@adoma.cdc-habitat.fr 0665472795
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 38% of lots get three or fewer, and only 26% get more than ten.
77% of bids come from SMEs, and in 21% of lots no SME bid at all.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-100522.