Réalisation de Schémas Directeurs d’Assainissement des Eaux Usées pour diverses communes membre de la Communauté d'Agglomération de Nîmes Métropole
COMMUNAUTE AGGLO NIMES METROPOLE
Gard
30 Nov 2026
19 Oct 2026
To win this one
- The score: Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival.
- The stakes: Observed value: €600,000 (trade median, 219 contracts), 3 expected bids (trade median, 147 contracts); about €200,000 expected, an order of magnitude, not a quote.
- The clock: 13 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- EPTEAU won « 2026-05_Réalisation du schéma directeur de l’assainissement collectif des eaux usées SMEMAC » with SMEMAC (Saône-et-Loire) : €836,298, 5 bids, 26/09/2026
- AMODIAG ENVIRONNEMENT won « Réalisation du Schéma Directeur d'assainissement et de Gestion des Eaux Pluviales et Ruissellement (SDAGEP) » with COM COM du Liancourtois Vallée Dorée (Oise) : €783,000, 06/11/2026
- EGIS EAU SA won « ETUDE DIAGNOSTIQUE, SCHEMA DIRECTEUR ET ZONAGE D'ASSAINISSEMENT » with Communauté d'agglomération Fécamp Caux Littoral (Seine-Maritime) : €926,696, 3 bids, 01/11/2026
- SAS GTOI won « Travaux d’extension de la ZAE Paniandy à Bras Panon - Lot n°04 : Assainissement des eaux usées » with CIREST : Communauté Intercommunale Réunion EST (974) (La Réunion) : €843,211, 28/10/2026
- Laboratoire Phytocontrol won « Contrôles analytiques des eaux - Autosurveillance des stations d'épuration, des réseaux d'eaux usées et pluvia » with Sète agglopôle Méditerranée (Hérault) : €200,000, 2 bids, 07/10/2026
Across these 5 contracts: median amount €836,298 (5 published) ; median of 3 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The amendment states a deadline of 2026-11-30, replacing 2026-11-23T12:00. Check the terms in the buyer's documents.
- Bids due on 30 November 2026, in 13 days (deadline amended by the buyer).
- Confirm the submission time or time zone on the buyer's platform.
- Up to 2 suppliers may be selected: first place is not the only one that counts, but the number actually selected depends on the bids received and the rules.
- A single lot: the contract is taken whole or not at all.
- Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival.
- Duration: 48 months (4 ans).
- Estimated value: 2 000 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline. These are in the consultation rules inside the tender file.
commande-publique-agglo@nimes-metropole.fr 0434035700
How this buyer will score
Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival.
- 50% Valeur technique
- 10% Critère environnemental
- 40% Prix des prestations
How many rivals you actually face
on "Etude" contracts, the median is 4 bids per lot; 34% of lots get three or fewer, and only 18% get more than ten.
89% of the bids come from SMEs.
Stakes: Observed value: €600,000 (trade median, 219 contracts), 3 expected bids (trade median, 147 contracts); about €200,000 expected, an order of magnitude, not a quote.
Measured on 67 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-101163.