Mission de maîtrise d'oeuvre relative à l’installation d’une centrale solaire en ombrières déploiement de bornes IRVE et rénovation de l’éclairage extérieur, site de Laon, CPAM de l’Aisne
CPAM DE L'AISNE
Aisne
20 Nov 2026
19 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Order of magnitude of the trade across France (376 awarded contracts in this trade): a quarter under €153,543, median €317,865, three quarters under €740,267; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SAS FABER won « Mission de maitrise d'oeuvre pour l'opération de rénovation énergétique du siège de la CPAM des Côtes d'Armor » with CPAM COTES D'ARMOR (Côtes-d'Armor) : €378,925, 08/11/2026
- ARTELIA SAS won « Mission de maîtrise d'oeuvre relative à la rénovation de l’éclairage des tunnels Ambroise Paré et Saint-Cloud » with Direction régionale et interdépartementale de l'Environnement, de l'Aménagement et des Transports d'Ile-de-France (DRIEAT-IF) (Hauts-de-Seine) : €195,980, 4 bids, 21/10/2026
- ALTEREA won « OP24E9B6 - Lycée Bréquigny (35) Rennes - Réfection toitures et déploiement centrales photovoltaïques - Mission » with Sembreizh (Ille-et-Vilaine) : €69,600, 15 bids, 11/11/2026
- TW INGENIERIE, ATW won « Mission de Maitrise d'oeuvre pour la réfection des façades du site de Douai de la CPAM de Lille Douai » with CPAM DE LILLE DOUAI (Nord) : €85,200, 16/09/2026
- GROUPEMENT AXE SAONE/BIOTEC/EGIS/ITC/JEOL/DEBOST won « Rénovation du Sichon en coeur urbain - Mission de maitrise d'oeuvre » with Vichy Communauté (Allier) : €1,074,840, 25/10/2026
Across these 5 contracts: median amount €195,980 (5 published) ; median of 9.5 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The notice was amended on 2026-11-13. Reread the documents and check the deadline before submitting your bid.
- The submission deadline has passed: do not prepare a submission for this notice.
- Duration: 9 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au cahier des charges ou au règlement de la consultation), the estimated value. These are in the consultation rules inside the tender file.
eric.delisle@assurance-maladie.fr +33 323654163
How many rivals you actually face
on "Ingénierie" contracts, the median is 5 bids per lot; 32% of lots get three or fewer, and only 19% get more than ten.
72% of the bids come from SMEs.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 31 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-101614.