Prestations de Maintenances, dépannages et Vérifications Réglementaires des Systèmes de Fermetures des Sites du Conseil Département de la Cote-d'Or
Département de la Côte d'Or
Côte-d'Or
20 Nov 2026
21 Oct 2026
Bid file for one lot: lot 1 lot 2 lot 3
To win this one
- The stakes: Observed value: €510,000 (trade median, 174 contracts), 3 expected bids (trade median, 113 contracts); about €170,000 expected, an order of magnitude, not a quote.
- The clock: 3 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- EIFFAGE ENERGIE SYSTEMES - NORD won « VERIFICATION REGLEMENTAIRE ET MAINTENANCE DES SYSTEMES DE SECURITE INCENDIE SSI DE CATEGORIE A ET B » with Ville de Grande-Synthe (Nord) : €167,960, 01/10/2026
- EIFFAGE ENERGIE SYSTEMES - CENTRE LOIRE, 3 PROTECTION won « VERIFICATION, MAINTENANCE ET DEPANNAGE DES EQUIPEMENTS DE SECURITE » with Ville de Chécy (Loiret) : €30,000, 5 bids, 06/11/2026
- AQUAENERGIA won « Maintenance et dépannage du système d'assainissement Vacuport - Gare d'eau de Lomme » with VNF - DT Nord Pas-de-Calais (Nord) : sole bidder, 29/10/2026
- CHUBB FRANCE, INCENDIE PROTECTION SECURITE won « MARCHE DE VÉRIFICATION ET DE MAINTENANCE DES ÉQUIPEMENTS DE SÉCURITÉ INCENDIE, SYSTÈMES DE DÉSENFUMAGE ET EXTI » with Communauté d'Agglomération de la Région Dieppoise (Seine-Maritime) : €81,722, 3 bids, 17/10/2026
- INEO RHONE ALPES AUVERGNE won « Vérification, Entretien, Maintenance et Dépannage des Installations de sécurité Incendie et de désenfumage de » with CA du Puy en Velay (Haute-Loire) : €301,949, 5 bids, 22/10/2026
Across these 5 contracts: median amount €124,841 (4 published) ; median of 4 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 November 2026, in 3 days.
- A single supplier will be selected. All or nothing.
- The contract is split into 3 lots, and one candidate may win at most 3. You may bid on the one that fits you only.
- Duration: 12 months.
- Estimated value: 2 291 360 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
dgsd.prat.dfcp.scp@cotedor.fr +33 380636917
How many rivals you actually face
on "Maintenance" contracts, the median is 2 bids per lot; 74% of lots get three or fewer, and only 2% get more than ten.
51% of bids come from SMEs, and in 33% of lots no SME bid at all.
Stakes: Observed value: €510,000 (trade median, 174 contracts), 3 expected bids (trade median, 113 contracts); about €170,000 expected, an order of magnitude, not a quote.
Measured on 114 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-101882.