Mission de maitrise d'œuvre pour la requalification d'une friche de centre-ville sur la commune d'Hazebrouck
Société Publique de l'Agglomération Dunkerquoise
Nord
30 Nov 2026
22 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The score: Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival.
- The price: Observed prices in this département (10 awarded contracts in this trade): a quarter under €91,400, median €394,000, three quarters under €2,650,000; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 10 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- MICHEL DESVIGNE PAYSAGISTE, VERDI NORD DE FRANCE won « Mission de maîtrise d'oeuvre et missions complémentaires pour la requalification de l'avenue Jean Lebas à Roub » with Métropole Européenne de Lille (Nord) : €618,000, 23/10/2026
- Attica urbanisme paysage environnement, SYSTRA FRANCE won « Maîtrise d'oeuvre pour la requalification du boulevard périphérique et de ses carrefours, sur le périmètre de » with Groupement de commande entre la SPL Euralille et la Métropole Européenne de Lille dont le coordonnateur est la SPL Euralille (Nord) : €7,400,000, 16/09/2026
- Groupement LINK ARCHITECTES /ACTM /EIC2 /SECOBA /THERMIFLUIDES /GENIE ACOUSTIQUE /AGS DEVELOPPEM. /EPIGRAM BIM won « Sallanches - Mission de maitrise d'oeuvre pour la reconstruction du Centre d'Exploitation des Routes Départeme » with Département de la Haute-Savoie (Haute-Savoie) : 3 bids, 25/10/2026
- F.VIDBERG Architecture & Urbanisme won « Mission de maîtrise d'oeuvre pour la réhabilitation du centre d'intervention principal du SDIS 70 à HÉRICOURT » with Département de la Haute-Saône (Haute-Saône) : €227,500, 25 bids, 25/09/2026
- ARTELIA SAS, EGIS EAU SA won « ACCORDS-CADRES MULTI-ATTRIBUTAIRES RELATIFS AUX MISSIONS D'ETUDES ET MAITRISE D'OEUVRE POUR LE CONFORTEMENT ET » with Ville d'ANNECY (Haute-Savoie) : €800,000, 8 bids, 04/11/2026
Across these 5 contracts: median amount €709,000 (4 published) ; median of 8 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 November 2026, in 10 days.
- A single lot: the contract is taken whole or not at all.
- Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival.
- Duration: 28 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.
melissa.chantreau@s3d-spad.fr +33 328638410
How this buyer will score
Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival.
- 40% PRIX : Selon la méthode de calcul suivante : (Offre la moins disante / Offre de…l’entreprise) x 40.
- 50% Valeur technique20 points : Qualité esthétique, architecturale et pertinence des références présentées par le ou les architectes 15 points : Qualité technique et pertinence des références présentées par les autres membres de l’équipe de
- 10% Critère environnementalLa compréhension par le candidat des différents usages (restaurant / halle gourmande / commerce / bureaux), des différents cas de figure (réhabilitation / neuf), de la réglementation environnementale qui s’impose à
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 38% of lots get three or fewer, and only 26% get more than ten.
77% of bids come from SMEs, and in 21% of lots no SME bid at all.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102216.