Concours restreint de Maîtrise d'OEuvre pour la construction de la maison de l'intercommunalité sur la commune de la Côte St André
Bièvre Isère
Isère
20 Nov 2026
23 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Observed prices in this département (13 awarded contracts in this trade): a quarter under €273,945, median €451,408, three quarters under €819,812; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 1 day: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- MABIRE REICH ARCHITECTES won « Concours restreint de maîtrise d'oeuvre pour la construction de Modulaire du groupe scolaire de la ZAC de Mais » with Ville de Guerande (Loire-Atlantique) : €925,574, sole bidder, 29/09/2026
- ARCHIPAT won « MISSION DE MAITRISE D'OEUVRE POUR LA RESTRUCTURATION DU CHÂTEAU LOUIS XI SUR LA COMMUNE DE LA CÔTE-SAINT-ANDRÉ » with Département de l'Isère (Isère) : €888,237, 4 bids, 08/11/2026
- Des Clics et des Calques, I+A Laboratoire des structures won « Concours restreint de maîtrise d'oeuvre pour la réalisation d'une maison de santé et de bureaux administratifs » with SHEMA (Seine-Maritime) : 03/10/2026
- Studio Arch won « Concours restreint de maitrise d'oeuvre pour la construction d'une halle de sport sur le site des Grandes Comb » with Mairie de Courchevel (Savoie) : 3 bids, 25/10/2026
- SARL GBL ARCHITECTES, Egis Bâtiments Nord-Est won « CONCOURS RESTREINT DE MAITRISE D'OEUVRE SUR ESQUISSE POUR LA CONSTRUCTION D'UNE CUISINE CENTRALE - Phase 1 - C » with Mairie de Lesquin (Nord) : 23/10/2026
Across these 5 contracts: median amount €906,906 (2 published) ; median of 3 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 November 2026, tomorrow.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
commande.publique@bievre-isere.com 0476935146
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 38% of lots get three or fewer, and only 26% get more than ten.
77% of bids come from SMEs, and in 21% of lots no SME bid at all.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102554.