Accord-cadre relatif à la réalisation des Travaux d’Installation de courant faible dans les locaux du Centre Hospitalier de Mayotte
CENTRE HOSPITALIER DE MAYOTTE
Mayotte
20 Nov 2026
23 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
- The clock: 1 day: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SPIE BATIGNOLLES ENERGIE won « Travaux de courants faibles et de courants forts de l'EPML » with MUSEE DU LOUVRE (Paris) : €8,000,000, 22/10/2026
- GARCZYNSKI TRAPLOIR, SYGMATEL won « Travaux d'entretien et de maintenance sur l'ensemble des installations électriques du patrimoine du Départemen » with Département de la Sarthe (Sarthe) : €6,400,000, 4 bids, 21/10/2026
- EPM CONNECTIQUE, ASAP NETWORK won « INNERVATION COURANTS FAIBLES DES SITES EXTERNES DU DÉPARTEMENT DES BOUCHES-DU-RHÔNE » with Conseil départemental des Bouches-du-Rhône (Bouches-du-Rhône) : €234,280, 07/11/2026
- LES CONSTRUCTEURS DU ROCHER, DAUPHINE ISOLATION PROJECTION won « Reconstruction de l'internat du Centre Hospitalier de Béziers - Lots 02 à 20 » with SEM ARAC OCCITANIE (Hérault) : €2,150,000, 3 bids, 06/10/2026
- ATTA won « Guyane (973), FAG, Tous sites, Accord-cadre mixte portant sur la réalisation d’études et d’AMO pour les ins » with DID CAYENNE (Guyane) : 3 bids, 16/09/2026
Across these 5 contracts: median amount €4,275,000 (4 published) ; median of 3 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 November 2026, tomorrow.
- Confirm the submission time or time zone on the buyer's platform.
- Duration: 12 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères publiés en texte libre : les poids lus font 40 et non 100 (« L’Accord-cadre fixe toutes les stipulations contractuelles et donne lieu à l’émission de bons de commande conformément a »)), the estimated value. These are in the consultation rules inside the tender file.
gestioncellule.marches@chmayotte.fr 0269648034
How many rivals you actually face
on "Electricité (travaux)" contracts, the median is 5 bids per lot; 30% of lots get three or fewer, and only 9% get more than ten.
93% of the bids come from SMEs.
With this buyer: 4 contract(s) from this buyer are indexed on its latest contracts, all trades, with no published bid count. At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €810,222 (4 contracts, from €193,600 to €3,934,388).
Stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
Measured on 112 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-103233.