Remplacement luminaires chambres MIR
63 CHU
Puy-de-Dôme
23 Nov 2026
23 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Observed value: €639,681 (trade median, 175 contracts), 3 expected bids (trade median, 120 contracts); about €213,227 expected, an order of magnitude, not a quote.
- The clock: 4 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 November 2026, in 4 days.
- Duration: 3 months.
- Estimated value: 50 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Electricité (travaux)" contracts, the median is 5 bids per lot; 29% of lots get three or fewer, and only 9% get more than ten.
85% of the bids come from SMEs.
Stakes: Observed value: €639,681 (trade median, 175 contracts), 3 expected bids (trade median, 120 contracts); about €213,227 expected, an order of magnitude, not a quote.
Measured on 116 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-103299.