SELECTION D’UN PROJET POUR LA REALISATION D’UN ENSEMBLE IMMOBILIER D'ENVIRON 41 LOGEMENTS COLLECTIFS A BONNEVILLE (74) EN CPI
Foncière Logement (75)
Haute-Savoie
25 Nov 2026
28 Oct 2026
To win this one
- The stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
- The clock: 8 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- KERN ILE DE FRANCE (SYMTRIA), PLURIEL[LES] ARCHITECTES - ATELIER MG won « Marché de Conception-Réalisation d'environ 51 logements et de 02 niveaux de stationnements d'a minima de 39 pl » with Hauts-de-Seine Habitat - OPH (Hauts-de-Seine) : €8,847,581, 07/10/2026
- Logisur, CHAMPAGNE CONSTRUCTION RENOVATION won « Rénovation d'un ensemble immobilier à usage de bureaux situé au 42, rue d'Anjou - 75008 Paris » with Caisse d'Assurance Vieillesse des Pharmaciens (Paris) : €759,048, 3 bids, 07/11/2026
- AKAJOULE, oteis won « Réalisation d'audits énergétiques dans le cadre des projets de rénovation énergétique de bâtiments publics sur » with Syndicat des énergies et de l'aménagement numérique de la Haute-Savoie (SYANE) (Haute-Savoie) : €220,000, 9 bids, 28/10/2026
- JULIEN LAVOINE, ATELIER COPO won « Réalisation d'un ensemble bâti neuf destiné à accueillir un tiers lieu artistique et culturel » with Ville du Bouscat (Gironde) : €108,516, 21/10/2026
- EIFFAGE CONSTRUCTION SUD EST won « Construction de 84 logements étudiants sur le site AGROPARC à Avignon - CROUS AIX MARSEILLE AVIGNON - Marché d » with CROUS d'Aix Marseille (Vaucluse) : €5,900,000, 03/11/2026
Across these 5 contracts: median amount €759,048 (5 published) ; median of 6 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 25 November 2026, in 8 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- Duration: 36 months (3 ans).
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation), the estimated value. These are in the consultation rules inside the tender file.
ylallinec@foncierelogement.com +33 142184242
How many rivals you actually face
on "Bâtiment" contracts, the median is 4 bids per lot; 34% of lots get three or fewer, and only 6% get more than ten.
87% of the bids come from SMEs.
Stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-104232.