Travaux de mise en conformité des installations électriques
Le Logement Familial de l'Eure (27)
Eure
20 Nov 2026
28 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
- The clock: 1 day: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SOCOTEC EQUIPEMENTS SAS won « Contrôles réglementaires des installations électriques » with NOREADE SIDEN-SIAN (Nord) : 29/10/2026
- SOVEC ENTREPRISES won « Maintenance des installations électriques à l'Hôtel d'Alsace Strasbourg » with Collectivité européenne d Alsace (Bas-Rhin) : €144,000, 30/10/2026
- INEO AQUITAINE, FAUCHE won « Exploitation et maintenance des installations électriques » with UNIVERSITE DE BORDEAUX (Dordogne) : 06/10/2026
- GARCZYNSKI TRAPLOIR, SYGMATEL won « Travaux d'entretien et de maintenance sur l'ensemble des installations électriques du patrimoine du Départemen » with Département de la Sarthe (Sarthe) : €6,400,000, 4 bids, 21/10/2026
- CEFF won « Travaux de maintenance électrique des infrastructures maritimes et fluviales » with Département de la Seine-Maritime (Seine-Maritime) : €2,800,000, 3 bids, 29/10/2026
Across these 5 contracts: median amount €2,800,000 (3 published) ; median of 3.5 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 November 2026, tomorrow.
- A single lot: the contract is taken whole or not at all.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Electricité (travaux)" contracts, the median is 5 bids per lot; 30% of lots get three or fewer, and only 9% get more than ten.
93% of the bids come from SMEs.
Stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
Measured on 112 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105024.