Maintenance des installations de Robinets d'Incendie Armés, surpresseurs et colonnes sèches de la Ville de Lyon et du CCAS de Lyon
Ville de Lyon
Rhône
07 Dec 2026
01 Nov 2026
To win this one
- The buyer: it switched supplier at the latest contract ; a median of 4 bids with this buyer.
- The stakes: Observed value: €2,000,000, 4 expected bids (median of 3 contracts in this trade with this buyer); about €500,000 expected, an order of magnitude, not a quote.
- The clock: 19 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- LA CENTRALE INCENDIE ETABLISSEMENTS DUBERNARD, SIRIS PROTECTION won « Maintenance et l’installation des extincteurs et des systèmes de sécurité incendie » with Mairie de Conflans-Sainte-Honorine (Yvelines) : €82,031, 7 bids, 01/10/2026
- Groupement ATEXIA-DEF OCEAN INDIEN, SEBS won « Accord-cadre à bons de commande portant sur la maintenance préventive et corrective des installations de lutte » with Direction d'Infrastructure de la Défense de Saint-Denis (La Réunion) : €1,185,712, 04/11/2026
- DEAL HYDRAULIQUE, TERIDEAL - SEGEX ENERGIES won « Contrôle et maintenance des dispositifs anti retour de la ville de Lyon » with Ville de Lyon (Rhône) : €800,000, 2 bids, 07/11/2026
- AXIMA CONCEPT won « Maintenance préventive et corrective des groupes froids de la ville de Lyon » with Ville de Lyon (Rhône) : €2,000,000, 4 bids, 31/10/2026
- SIEMENS S.A.S, CHUBB FRANCE won « Maintenance des systèmes de sécurité incendie » with Centre Hospitalier de Valence - Etablissement support GHT DAV (Drôme) : €999,512, sole bidder, 04/10/2026
Across these 5 contracts: median amount €999,512 (5 published) ; median of 3 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 7 December 2026, in 19 days.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Estimated value: 100 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 21 April 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration. These are in the consultation rules inside the tender file.
dcp.marches@mairie-lyon.fr 0472103030
How many rivals you actually face
on "Prestations de services" contracts, the median is 3 bids per lot; 61% of lots get three or fewer, and only 8% get more than ten.
80% of the bids come from SMEs.
With this buyer: This buyer received a median of 4 bid(s) on its latest contracts in this trade (3 contracts where the number is published). At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €2,000,000 (3 contracts, from €800,000 to €4,000,000).
Stakes: Observed value: €2,000,000, 4 expected bids (median of 3 contracts in this trade with this buyer); about €500,000 expected, an order of magnitude, not a quote.
Measured on 319 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105654.