Accord-cadre d'études et de maîtrise d'oeuvre pour la restauration et la sécurisation des vestiges des Tours de Merle, du rocher et de leurs abords
Com Com Xaintrie Val'Dordogne
Corrèze
02 Dec 2026
01 Nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Order of magnitude of the trade across France (376 awarded contracts in this trade): a quarter under €153,543, median €317,865, three quarters under €740,267; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 11 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SAS SAFEGE (SUEZ Consulting) won « Maîtrise d'oeuvre-Sécurisation et aménagement de la RD5 pour l'accès au lycée Préfontaine à Macouria » with COLLECTIVITE TERRITORIALE DE GUYANE (Guyane) : €208,310, 6 bids, 16/10/2026
- ANTEA France won « Missions de maîtrise d'oeuvre pour la sécurisation des galeries souterraines sur le territoire de l'Eurométrop » with Eurométropole de Strasbourg (Bas-Rhin) : €400,000, 4 bids, 15/10/2026
- AEDIFICIO SARL won « Réhabilitation de la Tour Romane - Basilique Notre Dame de l'Epine à Evron » with Ville d'Evron (53) (Mayenne) : €131,720, 18/11/2026
- ATOME, GIE DARWIN CONCEPT won « Accord-cadre d'Etudes et de Maîtrise d'OEuvre pour travaux sur les installations électriques » with GRAND PORT MARITIME DE LA REUNION (La Réunion) : €356,975, 6 bids, 18/10/2026
- ENTRE CIEL ET TERRES / NASCA / ECOTONE INGENIERIE / BLD WATERDESIGN won « Missions de maîtrise d'oeuvre pour la restauration des jardins et du parc du château de Gaillon » with Communauté d'agglomération Seine Eure (Eure) : €730,000, 5 bids, 15/10/2026
Across these 5 contracts: median amount €356,975 (5 published) ; median of 5.5 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 2 December 2026, in 11 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Duration: 72 months (6 ans).
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 8 January 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas son critère de prix), the estimated value. These are in the consultation rules inside the tender file.
accueil@xaintrie-val-dordogne.fr 0555910175
How many rivals you actually face
on "Ingénierie" contracts, the median is 5 bids per lot; 32% of lots get three or fewer, and only 19% get more than ten.
72% of the bids come from SMEs.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 31 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105782.