REHABILITATION DE L’EHPAD DU MOULIN A VENT CENTRE HOSPITALIER MARGUERITE DE LORRAINE marché de maitrise d'oeuvre
CTRE HOSP INTERCOMMUNAL ALENCON MAMERS
Orne
05 Dec 2026
04 Nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Order of magnitude of the trade across France (376 awarded contracts in this trade): a quarter under €153,543, median €317,865, three quarters under €740,267; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 15 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- PIERRE-ANTOINE GATIER ARCHITECTE EN CHEF DES MONUMENTS HISTORIQUES won « Accord-cadre mono attributaire de maitrise d'oeuvre pour la réhabilitation du Vieux Moulin - site du Pont du G » with Conseil départemental du Gard (Gard) : €7,200,000, 3 bids, 17/11/2026
- COCO ARCHITECTURE won « Concours restreint de maîtrise d’œuvre sur ESQUISSE pour la Réhabilitation et l’extension de l’IFPS du Centre » with CHU CAEN (Calvados) : €844,800, 18/09/2026
- CRR ARCHITECTURE (Architecte mandataire du groupement) won « Marché de maîtrise d'oeuvre pour le projet d'extension et de modernisation du Centre Hospitalier de Toul » with 54 CHRU (Meurthe-et-Moselle) : 4 bids, 14/09/2026
- SARL D'ARCHITECTURE AMELLER, DUBOIS ET ASSOCIES won « Concours restreint de maitrise d'oeuvre pour la réhabilitation et l'extension des bâtiments du Bloc Médico-Chr » with CH Blois Etablissement support du GHT Santé 41 (Loir-et-Cher) : 3 bids, 12/11/2026
- LE GUYADER ENGINEERING ARCHITECTURE won « Marché de maîtrise d'oeuvre pour les travaux de restructuration du service des Urgences du Centre Hospitalier » with CENTRE HOSPITALIER DE DIEPPE (Seine-Maritime) : €252,000, 11 bids, 15/10/2026
Across these 5 contracts: median amount €844,800 (3 published) ; median of 3.5 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 5 December 2026, in 15 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- Duration: 54 months.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation), the estimated value. These are in the consultation rules inside the tender file.
marchespublics@ch-alencon.fr 0233323030
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 38% of lots get three or fewer, and only 26% get more than ten.
77% of bids come from SMEs, and in 21% of lots no SME bid at all.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.