Maîtrise d'oeuvre pour la construction de l'Hôpital de Jour au extension du C.A.T.T.G existant - Secteur 59G11 - pour l'E.P.S.M de l'Agglomération Lilloise
EPSM Lille Métropole
Nord
07 Dec 2026
06 Nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Observed prices in this département (10 awarded contracts in this trade): a quarter under €91,400, median €394,000, three quarters under €2,650,000; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 17 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- MICHEL BEAUVAIS ASSOCIES won « Marché de maitrise d'oeuvre pour la construction du nouvel hôpital d'Alençon » with CHIC ALENCON MAMERS (Orne) : €13,715,636, 3 bids, 15/10/2026
- HB MORE won « 2025-0549 PRESTATIONS DE MAITRISE D'OEUVRE POUR LES TRAVAUX DE CREATION D'UN BATIMENT DE CONSULTATION ET D'HOP » with CENTRE HOSPITALIER VALVERT (Bouches-du-Rhône) : €1,063,428, 31 bids, 18/11/2026
- MICHEL REMON & ASSOCIES won « Marché de maîtrise d'oeuvre pour la reconstruction de l'Hôpital du Raincy-Montfermeil » with GROUPEMENT HOSPITALIER DE TERRITOIRE GRAND PARIS NORD EST (Seine-Saint-Denis) : 3 bids, 01/10/2026
- Atelier Brigitte GALLONI Architectes Associés, PROJEX won « Maîtrise d'œuvre pour l'extension de la maternité » with Centre Hospitalier d'Avignon (Vaucluse) : €397,375, 06/10/2026
- ARMOR INGENIERIE, ADA ARCHITECTURE won « Mission de maîtrise d'oeuvre pour les travaux de mise en conformité désenfumage Bloc Hôpital » with 35 CHU (Ille-et-Vilaine) : €380,250, 22/10/2026
Across these 5 contracts: median amount €730,402 (4 published) ; median of 3 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 7 December 2026, in 17 days.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
nathalie.romain@ghtpsy-npdc.fr +33 320102232
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 38% of lots get three or fewer, and only 26% get more than ten.
77% of bids come from SMEs, and in 21% of lots no SME bid at all.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108022.