CHERBOURG-EN-COTENTIN (50) - Site des Ecoles de Querqueville - Construction de bâtiments d'hébergement - Mission de contrôle technique
SID Nord-Ouest
Manche
11 Dec 2026
08 Nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Observed value: €550,000 (trade median, 297 contracts), 3 expected bids (trade median, 195 contracts); about €183,333 expected, an order of magnitude, not a quote.
- The clock: 16 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- PREVENTEC won « missions de contrôle technique concernant des opérations de construction, de réhabilitation et de diagnostics » with SEM SEINE OUEST HABITAT ET PATRIMOINE (Hauts-de-Seine) : €6,000,000, 28/10/2026
- VALLET DE MARTINIS, SOCIETE D'ARCHITECTURE ROUSSEL LAGOUGE won « CONCOURS RESTREINT DE MAÎTRISE D'UVRE POUR LA CONSTRUCTION D'UNE ECOLE MATERNELLE INTEGRANT UN ACCUEIL DE LOI » with Commune de Chilly-Mazarin (Essonne) : 123 bids, 27/09/2026
- EUROVIA ALSACE LORRAINE, SELTZ CONSTRUCTIONS won « Construction de l'extension de l'école du BOHRIE et d'un accueil périscolaire à Ostwald » with Ville d'OSTWALD (Bas-Rhin) : €715,045, 2 bids, 06/11/2026
- Schneider Matthys Architecture, SAM architecture won « REHABILITATION ET EXTENSION DE L’ECOLE JULES FERRY INTEGRANT UN ACCEUIL DE LOISIRS SANS HEBERGEMENT ELEMENTAIR » with Ville de Sens (Yonne) : €526,500, 3 bids, 04/10/2026
- SAS GRIMAUD FONDATIONS, SAS RABOT DUTILLEUL won « Construction par lÉtablissement Public Campus Condorcet (EPCC) du nouveau siège de lÉcole Pratique de Hautes » with ÉTABLISSEMENT PUBLIC CAMPUS CONDORCET (Seine-Saint-Denis) : €1,423,143, 36 bids, 20/11/2026
Across these 5 contracts: median amount €1,069,094 (4 published) ; median of 19.5 bids (4 published) ; Schneider Matthys Architecture, SAM architecture appears 2 times.
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 11 December 2026, in 16 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- Duration: 48 months (4 ans).
The notice does not state : the question deadline, the score breakdown (aucune pondération chiffrée dans l'avis), the estimated value. These are in the consultation rules inside the tender file.
marie-astrid.eon@intradef.gouv.fr +33 0 02 23 35 29 56
How many rivals you actually face
on "Contrôle technique" contracts, the median is 3 bids per lot; 78% of lots get three or fewer, and only 0% get more than ten.
27% of bids come from SMEs, and in 25% of lots no SME bid at all.
With this buyer: 3 contract(s) from this buyer are indexed on its latest contracts, all trades, with no published bid count. Most frequent holder: SPIE FACILITIES (2 times). At the latest contract the holder changed: this buyer does not renew by default.
Stakes: Observed value: €550,000 (trade median, 297 contracts), 3 expected bids (trade median, 195 contracts); about €183,333 expected, an order of magnitude, not a quote.
Measured on 36 awarded lots that publish their statistics. 55% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108150.