Travaux - Construction D'Une Maison D'Accueil Specialisee (Mas) Au Centre Hospitalier De Saint-Aignan Sur Cher
Ch Blois Etablissement support du Ght Santé 41
Loir-et-Cher
10 Dec 2026
06 Nov 2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8 lot 9 lot 10 lot 11 lot 12 lot 13 lot 14 lot 15
To win this one
- The stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
- The clock: 22 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- GAGNERAUD, L.RENAULT won « Marché de travaux de réhabilitation du bâtiment Jehan ANGO de la Résidence Panorama, Site de Mont Saint Aigna » with CROUS Normandie (Seine-Maritime) : €629,948, 04/11/2026
- VIANO BTP, PASQUET won « Travaux de construction de 36 logements et d'une maison commune à Châtillon-sur-Indre - "Les Barbarines" » with OPAC 36 (Indre) : €1,655,012, 15/09/2026
- CHAPRON, LEROY PAYSAGES won « Construction d'une Maison de Santé Pluriprofessionnelle et d'un laboratoire à Evron » with Communauté de communes des Coëvrons (53) (Mayenne) : €419,319, 11/11/2026
- RGP ST BARTH won « Accord-cadre travaux de plomberie pour l'entretien, les modifications et la construction des locaux et aménage » with Collectivité de Saint Barthélemy (977) (Saint-Barthélemy) : €4,000,000, 15/10/2026
- EUROVIA ALSACE LORRAINE, SELTZ CONSTRUCTIONS won « Construction de l'extension de l'école du BOHRIE et d'un accueil périscolaire à Ostwald » with Ville d'OSTWALD (Bas-Rhin) : €715,045, 2 bids, 06/11/2026
Across these 5 contracts: median amount €715,045 (5 published) ; median of 2 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 10 December 2026, in 22 days.
- The contract is split into 15 lots. You may bid on the one that fits you only.
- Duration: 13 months.
- Estimated value: 3 790 572 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)). These are in the consultation rules inside the tender file.
+33 254556303
How many rivals you actually face
on "Bâtiment" contracts, the median is 4 bids per lot; 34% of lots get three or fewer, and only 6% get more than ten.
87% of the bids come from SMEs.
With this buyer: This buyer received a median of 4 bid(s) on its latest contracts, all trades (3 contracts where the number is published). At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €292,024 (2 contracts, from €290,260 to €293,788).
Stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108272.