Réalisation d'une mission d'assistance à maîtrise d'ouvrage pour le renouvellement des automates de la blanchisserie
Centre Hospitalier du Centre Bretagne
Morbihan
11 Dec 2026
06 Nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Order of magnitude of the trade across France (376 awarded contracts in this trade): a quarter under €153,543, median €317,865, three quarters under €740,267; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 21 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- ATELIER D'ARCHITECTURE CROSSMAN won « Mission de maîtrise d'oeuvre pour la réalisation d'un ensemble de bureaux pour le SMMAR EPTB AUDE situé à CARC » with SMMAR (Syndicat Mixte Milieux Aquatiques et Rivières) (Aude) : €195,500, 16 bids, 18/11/2026
- DIE REMEDIATION won « Accord-cadre à bons de commande portant sur une mission d'assistance à maîtrise d'ouvrage et d'ingénierie en q » with Paris & Métropole aménagement (Paris) : €520,000, 21/10/2026
- SARL PROJET won « PROGRAMMATION ET ASSISTANCE A MAITRISE D'OUVRAGE (AMO) DANS LE CADRE D'UN MARCHE GLOBAL DE PERFORMANCE COMPREN » with Euro-Métropole de Metz (Moselle) : €291,815, 7 bids, 10/11/2026
- Ingénierie Sportive et Culturelle (ISC) won « Mission d'assistance à Maîtrise d'Ouvrage relative aux études stratégiques et de programmation pour la restruc » with Eurométropole de Strasbourg (Bas-Rhin) : €296,469, 11 bids, 25/10/2026
- EGIS EAU won « Accord cadre de maîtrise d'œuvre, d'études réglementaires et d'assistance à maîtrise d'ouvrage pour la réalisa » with Clisson Sèvre et Maine Agglo (Loire-Atlantique) : €440,872, 4 bids, 05/11/2026
Across these 5 contracts: median amount €296,469 (5 published) ; median of 9 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 11 December 2026, in 21 days.
- Duration: 48 months (4 ans).
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
+33 297790213
How many rivals you actually face
on "Ingénierie" contracts, the median is 5 bids per lot; 32% of lots get three or fewer, and only 19% get more than ten.
72% of the bids come from SMEs.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 31 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108370.