étude de faisabilité géothermique et stratégie énergétique patrimoniale - Analyse des synergies avec le développement photovoltaïque
Fondation Bon Sauveur d'Alby
Tarn
07 Dec 2026
09 Nov 2026
To win this one
- The stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
- The clock: 19 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 7 December 2026, in 19 days.
- Duration: 6 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Etude" contracts, the median is 4 bids per lot; 34% of lots get three or fewer, and only 18% get more than ten.
89% of the bids come from SMEs.
Stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
Measured on 67 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108789.