Opération Pompidou 2030
OPPIC
Paris
08 Jan 2027
10 Nov 2026
To win this one
- The score: Quality carries 50% against 50% for price. A solid technical proposal beats a cheaper rival. (Weighting read from the notice's free text: confirm it in the consultation rules.)
- The stakes: Observed value: €660,000 (trade median, 23 contracts), 2.5 expected bids (trade median, 16 contracts); about €264,000 expected, an order of magnitude, not a quote.
- The clock: 51 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 8 January 2027, in 51 days.
- A single lot: the contract is taken whole or not at all.
- Quality carries 50% against 50% for price. A solid technical proposal beats a cheaper rival. (Weighting read from the notice's free text: confirm it in the consultation rules.)
- Duration: 45 months.
- Estimated value: 5 670 000 €.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
- Variants are REQUIRED: a bid without one would be irregular there. Read exactly what the rules expect, lot by lot.
The notice does not state : the question deadline. These are in the consultation rules inside the tender file.
departement.marches@oppic.fr 01 44 97 78 00
How this buyer will score
Quality carries 50% against 50% for price. A solid technical proposal beats a cheaper rival. (Weighting read from the notice's free text: confirm it in the consultation rules.)
- 50% Critère prix
- 50% Critère valeur technique
How many rivals you actually face
on "Bois" contracts, the median is 3 bids per lot; 67% of lots get three or fewer, and only 0% get more than ten.
50% of bids come from SMEs, and in 50% of lots no SME bid at all.
Stakes: Observed value: €660,000 (trade median, 23 contracts), 2.5 expected bids (trade median, 16 contracts); about €264,000 expected, an order of magnitude, not a quote.
Measured on 12 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108806.