Assurance dommages-ouvrage pour la construction du siège social unique de la 3CBO à Chuelles
Communauté de communes 3CBO
Loiret
25 Nov 2026
10 Nov 2026
To win this one
- The stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
- The clock: 7 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- AXA France IARD, VERSPIEREN SA won « Marché de service d'assurance dommages ouvrage et contrat collectif de responsabilité décennale dans le cadre » with Région Île de France (Seine-Saint-Denis) : €278,722, 06/11/2026
- SMABTP won « Assurance dommage ouvrage et garanties complémentaires pour l'opération d'aménagement du R+2 du bâtiment IPREM » with Université Pau et des Pays de l'Adour (Pyrénées-Atlantiques) : €12,217, sole bidder, 06/10/2026
- TEMEN, MUTUELLE DES ARCHITECTES FRANÇAIS won « Marché de services d'assurance dommages-ouvrage et contrat collectif de responsabilité décennale dans le cadre » with Région Ile de France (Paris) : €196,030, 3 bids, 21/10/2026
- AXA France IARD won « Marché d'assurance DO pour la construction d'un écopôle » with Soderec - COBAS (33) (Gironde) : €23,255, 2 bids, 13/10/2026
- SOCIETE MUTUELLE D'ASSURANCE DU BATIMENT ET DES TRAVAUX PUBLICS, VERSPIEREN won « Souscription des marchés d’Assurance pour la construction d’une patinoire communautaire » with LIMOGES METROPOLE - Communauté urbaine (Haute-Vienne) : €162,442, 3 bids, 27/10/2026
Across these 5 contracts: median amount €162,442 (5 published) ; median of 2.5 bids (4 published) ; AXA France IARD appears 2 times.
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 25 November 2026, in 7 days.
- Duration: 120 months (10 ans).
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
juridique@3cbo.fr +33 238952515
How many rivals you actually face
on "Assurance" contracts, the median is 2 bids per lot, and 30% of lots receive a single one. Renouncing here is renouncing a contract nobody else wants.
24% of bids come from SMEs, and in 62% of lots no SME bid at all.
Stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
Measured on 168 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-109630.