Building & structural worksin 21 daysProcédure adaptée (attribution possible sans négociation)

Travaux de contrôle de serrage des poteaux sur les lignes A et B du tramway Orleans Metropole

Buyer

Orléans Métropole

Location

Loiret

Deadline

09 Dec 2026

in 21 days
Published

12 Nov 2026

Open the notice & tender file ↗ Read the expert study (in French) Download the bid file (ZIP, in French)

To win this one

  • The score: Price carries 60%, quality 40%. You need both: a tight price and a proposal that loses no points. (Weighting read from the notice's free text: confirm it in the consultation rules.)
  • The stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
  • The clock: 21 days: start this week, site visit or questions to the buyer before the end of week one.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • REACONCEPT won « Tramway T7 Travaux de Réaménagement du Bâtiment CONDORCET » with Setec Organisation au nom et pour le compte d’Ile de France Mobilités (Essonne) : €2,498,851, 08/10/2026
  • CEPECA won « Marché d' Entretien, rénovation et contrôle nocturne et diurne des mises en lumière » with Ville de Bordeaux (Gironde) : €4,000,000, 3 bids, 10/11/2026

Across these 2 contracts: median amount €3,249,426 (2 published) ; median of 3 bids (1 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 9 December 2026, in 21 days.
  • Price carries 60%, quality 40%. You need both: a tight price and a proposal that loses no points. (Weighting read from the notice's free text: confirm it in the consultation rules.)
  • Duration: 12 months.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.

Ask the buyer a question

+33 238792222

Open the tender file

How this buyer will score

Price carries 60%, quality 40%. You need both: a tight price and a proposal that loses no points. (Weighting read from the notice's free text: confirm it in the consultation rules.)

Quality 40%Price 60%
  • 40% Valeur technique de l'offre appréciée à l'aide du mémoire technique
  • 60% Prix apprécié au regard du total du Dqe
Prepare my technical proposal →

How many rivals you actually face

on "Matériaux de construction" contracts, the median is 3 bids per lot; 75% of lots get three or fewer, and only 0% get more than ten.

3bids per lot, median
20%of lots get a single bidder
75%of lots get 3 bidders or fewer

0% of bids come from SMEs, and in 100% of lots no SME bid at all.

With this buyer: This buyer received a median of 4 bid(s) on its latest contracts, all trades (2 contracts where the number is published). At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €81,000,000 (2 contracts, from €22,000,000 to €140,000,000).

Stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.

Measured on 20 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Describe my business →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-110131.