Roads & utility networksin 26 daysProcédure adaptée (attribution possible sans négociation)

Aménagements et travaux de voirie pour les besoins de la Ville de Saint-Lô sur la période 2027 -2031

Buyer

Ville de Saint-Lô

Location

Manche

Deadline

14 Dec 2026

in 26 days
Published

12 Nov 2026

Open the notice & tender file ↗ Read the expert study (in French) Download the bid file (ZIP, in French)

To win this one

  • The stakes: Observed value: €765,637 (trade median, 145 contracts), 3 expected bids (trade median, 80 contracts); about €255,212 expected, an order of magnitude, not a quote.
  • The clock: 26 days: time to question the buyer, visit, and write a tailored proposal.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • ENTREPRISE JEAN LEFEBVRE LORRAINE won « TRAVAUX DE REFECTION ET D'AMENAGEMENTS VRD » with Euro-Métropole de Metz (Moselle) : €729,726, 5 bids, 15/10/2026
  • SA Luc DURAND, TPPL SAUMUR won « Travaux d'entretien et d'aménagement des voiries et des espaces publics communautaires et communaux » with Ville de Saumur (49) (Maine-et-Loire) : €14,500,000, 23/10/2026
  • GUINTOLI, BRETTES PAYSAGE SAS won « Travaux d'aménagement de la place Andrée Chédid » with Bordeaux Métropole (Gironde) : €2,264,228, sole bidder, 18/10/2026
  • SOGEA GUYANE SAS, MARONI TRANSPORT INTERNATIONAL SARL won « Travaux d'aménagement du carrefour Margot » with Établissement Public Foncier et d'Aménagement de la Guyane - EPFA Guyane (Guyane) : €4,436,608, 11/10/2026
  • SOGEA won « Travaux d'aménagements des espaces publics de la phase 2.1 Lot 2 : Terrassements, Voirie, et Assainissement EU » with Établissement Public Foncier et d'Aménagement de la Guyane (Guyane) : €6,992,951, 16/10/2026

Across these 5 contracts: median amount €4,436,608 (5 published) ; median of 3 bids (2 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 14 December 2026, in 26 days.
  • Duration: 48 months (4 ans).
  • Estimated value: 3 200 000 €.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline, the score breakdown (critères publiés en texte libre : moins de deux critères pondérés lisibles (« La valeur technique (les sous-critères sont précisés dans le Rc) : 45% Performances en matière de protection de l'envir »)). These are in the consultation rules inside the tender file.

Ask the buyer a question

+33 214290000

Open the tender file

How many rivals you actually face

across French public contracts, the median is 3 bids per lot; 56% of lots get three or fewer, and only 9% get more than ten.

3bids per lot, median
19%of lots get a single bidder
56%of lots get 3 bidders or fewer

67% of bids come from SMEs, and in 20% of lots no SME bid at all.

Stakes: Observed value: €765,637 (trade median, 145 contracts), 3 expected bids (trade median, 80 contracts); about €255,212 expected, an order of magnitude, not a quote.

Measured on 4353 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Describe my business →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-110198.