Sécurisation du site du lycée François Rabelais à Saint-Chély-d'Apcher - Lot unique : Travaux d'équipements électrique
Spl Arac Occitanie
Lozère
15 Dec 2026
17 Nov 2026
To win this one
- The score: Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival. (Weighting read from the notice's free text: confirm it in the consultation rules.)
- The stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
- The clock: 27 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- EDF COMMERCE, ENGIE won « LA FOURNITURE ET L'ACHEMINEMENT D'ENERGIE ELECTRIQUE DES SITES C4 ET C5 » with OPH 05 (Hautes-Alpes) : €895,279, 4 bids, 28/10/2026
- CEFF won « Travaux de maintenance électrique des infrastructures maritimes et fluviales » with Département de la Seine-Maritime (Seine-Maritime) : €2,800,000, 3 bids, 29/10/2026
- ATTA won « Guyane (973), FAG, Tous sites, Accord-cadre mixte portant sur la réalisation d’études et d’AMO pour les ins » with DID CAYENNE (Guyane) : 3 bids, 16/09/2026
- SCHNEIDER ELECTRIC FRANCE won « Maintenance des équipements électriques et de distribution de froid de l’infrastructure informatique » with VOIES NAVIGABLES DE FRANCE (Pas-de-Calais) : 02/10/2026
- COLAS FRANCE -Etablissement Côte d'Opale, EPM GAS TECHNOLOGY FRANCE won « Travaux de rénovation de la station GNV et ajout d'emplacements de recharge pour bus électriques » with Communauté d'agglomération du Boulonnais (Pas-de-Calais) : €244,994, 8 bids, 04/11/2026
Across these 5 contracts: median amount €895,279 (3 published) ; median of 3.5 bids (4 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 15 December 2026, in 27 days.
- Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival. (Weighting read from the notice's free text: confirm it in the consultation rules.)
The notice does not state : the question deadline, the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How this buyer will score
Quality carries 60% against 40% for price. A solid technical proposal beats a cheaper rival. (Weighting read from the notice's free text: confirm it in the consultation rules.)
- 50% Valeur technique de l'offre
- 10% Aspects environnementaux de l'offre
- 40% Prix des prestations
How many rivals you actually face
on "Electricité (travaux)" contracts, the median is 5 bids per lot; 30% of lots get three or fewer, and only 9% get more than ten.
93% of the bids come from SMEs.
With this buyer: This buyer received a median of 3.5 bid(s) on its latest contracts, all trades (4 contracts where the number is published). At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €327,121 (4 contracts, from €69,680 to €1,180,658).
Stakes: Observed value: €639,681 (trade median, 169 contracts), 3 expected bids (trade median, 117 contracts); about €213,227 expected, an order of magnitude, not a quote.
Measured on 112 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-111513.