Rénovation d'un bâtiment de 90 logements collectifs - Îlot Savary
PODELIHA
Maine-et-Loire
31 Dec 2026
06 Feb 2026
To win this one
- The stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
- The clock: 44 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- BARLET TRAVAUX PUBLICS, JT Constructions won « CONSTRUCTION D'UN POLE DE SANTE PLURIDISCIPLINAIRE ET DE LOGEMENTS DE FONCTION » with Commune des Gets (Haute-Savoie) : €280,000, 2 bids, 15/11/2026
- VIANO BTP, PASQUET won « Travaux de construction de 36 logements et d'une maison commune à Châtillon-sur-Indre - "Les Barbarines" » with OPAC 36 (Indre) : €1,655,012, 15/09/2026
- EDATER won « Evaluation d'impact du soutien régional à la rénovation énergétique des logements du parc privé via l'informat » with Région Normandie (Calvados) : €52,700, 9 bids, 10/10/2026
- KERN ILE DE FRANCE (SYMTRIA), PLURIEL[LES] ARCHITECTES - ATELIER MG won « Marché de Conception-Réalisation d'environ 51 logements et de 02 niveaux de stationnements d'a minima de 39 pl » with Hauts-de-Seine Habitat - OPH (Hauts-de-Seine) : €8,847,581, 07/10/2026
- DANIEL TP, MARSE CONSTRUCTION won « TRAVAUX DE RENOVATION ENERGETIQUE ET DE MISE EN ACCESSIBILITE DU COLLEGE CLOTILDE VAUTIER A RENNES » with SPL CONSTRUCTION PUBLIQUE D’ILLE-ET-VILAINE (Ille-et-Vilaine) : €459,573, 17/11/2026
Across these 5 contracts: median amount €459,573 (5 published) ; median of 5.5 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 31 December 2026, in 44 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- Duration: 42 months.
- Estimated value: 0 €.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
kangot@podeliha.fr 0241687745
How many rivals you actually face
on "Maîtrise d'oeuvre" contracts, the median is 5 bids per lot; 37% of lots get three or fewer, and only 24% get more than ten.
76% of bids come from SMEs, and in 23% of lots no SME bid at all.
Stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
Measured on 82 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-12752.