Maintenance du modèle de simulations multimodales des déplacements et de transport de marchandises de Nantes Métropole - N3M
Nantes Métropole
Loire-Atlantique
29 Oct 2026
24 Jun 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The notice was amended on 2026-09-10. The deadline did not move, so the file itself changed: reread it before submitting, a bid answering the previous version gets rejected.
- Bids due on 29 October 2026, in 28 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 5 months.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
contact.marches@nantesmetropole.fr +33 240994848
How many rivals you actually face
on "Maintenance" contracts, the median is 2 bids per lot, and 31% of lots receive a single one. Renouncing here is renouncing a contract nobody else wants.
47% of bids come from SMEs, and in 33% of lots no SME bid at all.
Measured on 80 awarded lots that publish their statistics. 52% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-61592.