To win this one
- The score: Price carries 60%, quality 40%. You need both: a tight price and a proposal that loses no points.
- The stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
- The clock: 5 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- COLAS France - Bâtiment travaux neuf, COLAS France - Etablissement de Pierrelaye won « Construction neuve d'un lycée à Magny-en-Vexin (95) » with Région Ile-de-France (Val-d'Oise) : €24,625,000, 6 bids, 06/11/2026
- SMTPC won « Construction du nouveau Centre de Secours (CS) de Kawéni - Marché de Conception-Réalisation » with SDIS (976) (Mayotte) : €9,197,999, 3 bids, 22/10/2026
- MARC SA won « Construction d'un nouveau chenil au Détachement Air n928 » with SID ATLANTIQUE (Finistère) : €2,200,726, 5 bids, 24/09/2026
- RACINEO CONSTRUCTION won « Construction des locaux de stockage et garages à Tignes - Nouveau lot "charpente bois" » with Commune de Tignes (Savoie) : €249,758, 5 bids, 13/11/2026
- DARVER, GROUPEMENT CUBERO/HORIONS/CARAYON won « Projet « Nouveau Thalassa » : travaux de rénovation complète des bâtiments existants sur le site du village de » with SEMABATH (Hérault) : €5,184,673, 8 bids, 11/10/2026
Across these 5 contracts: median amount €5,184,673 (5 published) ; median of 5 bids (5 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 November 2026, in 5 days.
- Confirm the submission time or time zone on the buyer's platform.
- The contract is split into 12 lots, and one candidate may win at most 12. You may bid on the one that fits you only.
- Price carries 60%, quality 40%. You need both: a tight price and a proposal that loses no points.
- Duration: 36 months (3 ans).
- Estimated value: 0 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline. These are in the consultation rules inside the tender file.
t.wittner@groupe-serl.fr 0472615000
How this buyer will score
Price carries 60%, quality 40%. You need both: a tight price and a proposal that loses no points.
- 60% Prix
- 40% Des sous critères pondérés sont indiqués à l'article 5.2.3 du règlement de…
How many rivals you actually face
on "Bâtiment" contracts, the median is 4 bids per lot; 34% of lots get three or fewer, and only 6% get more than ten.
87% of the bids come from SMEs.
Stakes: Observed value: €524,048 (trade median, 306 contracts), 3 expected bids (trade median, 197 contracts); about €174,683 expected, an order of magnitude, not a quote.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-84617.