Reconstruction du pont sur l'Aurence
VILLE DE LIMOGES
Haute-Vienne
30 Sept 2026
09 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 September 2026, in 5 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 6 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 2 November 2026.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
correspondre@aws-france.com 0555459385
This address is a platform relay: without a consultation reference your message may go nowhere. The phone is safer.
How many rivals you actually face
on "Gros oeuvre" contracts, the median is 4 bids per lot; 38% of lots get three or fewer, and only 4% get more than ten.
Measured on 116 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-86974.