FOURNITURE, INSTALLATION, RACCORDEMENT ET MISE EN SERVICE D’UN TUNNEL DE FINITION DESTINE AUX VETEMENTS DE TRAVAIL A LA BLANCHISSERIE DU CHU DE RENNES
35 CHU
Ille-et-Vilaine
19 Oct 2026
10 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 19 October 2026, in 24 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 3 months, renewable.
- Estimated value: 416 666 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (aucune pondération chiffrée dans l'avis). These are in the consultation rules inside the tender file.
virginie.portolleau@chu-rennes.fr +33299284369
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 54% of lots get three or fewer, and only 8% get more than ten.
66% of the bids come from SMEs.
Measured on 4666 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87080.