Hébergement et infogérance du système d’information SAP du Centre des monuments nationaux
CMN..
Paris
09 Oct 2026
10 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 9 October 2026, in 14 days.
- 100 suppliers will be selected: you do not need to be the best, only to be in the top 100.
- A single lot: the contract is taken whole or not at all.
- Duration: 6 months, renewable.
- Estimated value: 300 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
monuments-nationaux@monuments-nationaux.fr +33144548855
How many rivals you actually face
on "Monuments historiques" contracts, the median is 3 bids per lot; 52% of lots get three or fewer, and only 0% get more than ten.
85% of the bids come from SMEs.
Measured on 21 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87220.