Acquisition d’un Spectromètre à Fluorescence X
Institut Mines-Télécom Atlantique
Finistère
12 Oct 2026
10 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 12 October 2026, in 17 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 4 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 2 November 2026.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
dfin-pole-marches@imt-atlantique.fr +33251858514
How many rivals you actually face
on "Equipements spécialisés" contracts, the median is 2 bids per lot, and 34% of lots receive a single one. Renouncing here is renouncing a contract nobody else wants.
88% of the bids come from SMEs.
Measured on 35 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87241.