Fournitures de bancs d'injection de fautes
SGDSN
Paris
13 Oct 2026
11 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 13 October 2026, in 17 days.
- The contract is split into 2 lots. You may bid on the one that fits you only.
- An electronic auction is planned. Submitting is not enough: you will have to be available on auction day to bid live.
- Duration: 6 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
catherine.martin@sgdsn.gouv.fr +33171758278
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 54% of lots get three or fewer, and only 8% get more than ten.
66% of the bids come from SMEs.
Measured on 4666 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87786.