RN147 - Mise à 2x2 voies au nord de Limoges Suivis physico-chimiques de la qualité des eaux
DREAL Nouvelle-Aquitaine
Vienne
20 Oct 2026
15 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 October 2026, in 25 days.
- 20 suppliers will be selected: you do not need to be the best, only to be in the top 20.
- A single lot: the contract is taken whole or not at all.
- Duration: 3 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
stephanie.cadiot@developpement-durable.gouv.fr +33 764801189
How many rivals you actually face
on "Ingénierie" contracts, the median is 5 bids per lot; 45% of lots get three or fewer, and only 30% get more than ten.
73% of the bids come from SMEs.
Measured on 20 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88640.