Fourniture de courantomètres acoustiques, de pièces détachées et de prestations associées.
EPA Shom
Finistère
20 Oct 2026
15 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 October 2026, in 25 days.
- 50 suppliers will be selected: you do not need to be the best, only to be in the top 50.
- The contract is split into 3 lots. You may bid on the one that fits you only.
- Duration: 6 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
achats@shom.fr 0256312326
How many rivals you actually face
on "Equipements spécialisés" contracts, the median is 2 bids per lot, and 34% of lots receive a single one. Renouncing here is renouncing a contract nobody else wants.
88% of the bids come from SMEs.
Measured on 35 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88675.