Fabrication de faisceaux électriques pour véhicules
ECLPN
Haute-Vienne
15 Oct 2026
15 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Questions to the buyer until 9 October 2026, i.e. 14 days.
- Bids due on 15 October 2026, in 20 days.
- 100 suppliers will be selected: you do not need to be the best, only to be in the top 100.
- A single lot: the contract is taken whole or not at all.
- Duration: 6 months.
The notice does not state : the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
eclpn-marches@interieur.gouv.fr 0519032325
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 54% of lots get three or fewer, and only 8% get more than ten.
66% of the bids come from SMEs.
Measured on 4666 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88751.