Accompagnement au développement d'une opération pilote d'autoconsommation collective sur la zone d'activités économiques de Bel Air et étude de faisabilité d'un parc photovoltaïque
Ca Rodez Agglomeration
Aveyron
09 Oct 2026
14 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
on "Etude" contracts, the median is 5 bids per lot; 36% of lots get three or fewer, and only 10% get more than ten.
70% of the bids come from SMEs.
Measured on 67 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88885.