Fourniture et livraison de pièces détachées pour les machines industrielles pour le CHU de Poitiers
CHU DE POITIERS
Vienne
30 Sept 2026
16 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 September 2026, in 5 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 5 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
elodie.fournier@chu-poitiers.fr 0549444050
How many rivals you actually face
on "Pièces détachées" contracts, the median is 2 bids per lot, and 47% of lots receive a single one. Renouncing here is renouncing a contract nobody else wants.
71% of the bids come from SMEs.
Measured on 79 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-89046.