Modifications de la signalisation pour l'extension du remisage Poudrette
SYTRAL Mobilités - TRANSPORT
Rhône
16 Oct 2026
17 Sept 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 16 October 2026, in 20 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 8 months, renewable.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 16 December 2026.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
unitemarches@sytral.fr 0472845800
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 54% of lots get three or fewer, and only 8% get more than ten.
66% of the bids come from SMEs.
Measured on 4672 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-89456.